Optimizing Manufacturing Throughput And Lead Time Through Process Synchronization And Agile Planning And Scheduling
- Discussing synchronized planning and scheduling, including master production schedule and synchronized material requirement
- Examining the business and operational challenges prior to the deployment of ORTEMS
- Reviewing deployment methodology and change management approaches
- Demonstrating dramatic improvements in throughput, lead time and identification of plant bottlenecks
- Case study: Using ORTEMS planning and scheduling to optimize manufacturing throughput and lead time of an air conditioning unit plant